Top roof is complete.
Interior walls are being plastered smooth!
Front of my home!
Back of home, with full afternoon sun! Important, at 7000 feet.
Left side of photo is location of a glass enclosed, spiral staircase,
to the third floor patio, which will have bath and wet-bar area.
Second floor view from living room, over brick curve of bar and into kitchen,
with back kitchen window showing Carlos and Will's back wall.
Left side of photo shows plastered walls. Center brick walls are the kitchen's.
Conduit lines are chiseled into the brick walls, inlaid with pipes or wires, then plastered over.
One the brick walls, the black, vertical line is gas; white, horizontal line in center is water line;
red vertical line (difficult to see) under window is electricity.
Second floor view. Front door is bright spot on left side,
with kitchen wall & bar on far right.
Two shown doorways are to bedrooms.
Notice electric outlets and switch boxes holes with leading wires plastered over.
Second floor front bedroom!
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1 | 2 | |||||
| 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| 10 | 11 | 12 | 13 | 14 | 15 | 16 |
| 17 | 18 | 19 | 20 | 21 | 22 | 23 |
| 24 | 25 | 26 | 27 | 28 | 29 | 30 |
| 31 |